Manufacturing
From the core to the completed unit.
A closer look at the manufacturing stages shown in the company brochure — and the details to agree for your project.
Inside the process
Every stage has a role in the final result.




Production planning
Good manufacturing starts before production.
The agreed electrical schedule and installation requirements define the work that follows. Connections, cooling, insulation, enclosure, monitoring and testing all need to be considered as part of the same equipment package.
Share your inspection points, drawing approval process and delivery requirements early. The production scope and schedule should be confirmed in the project proposal.
Before the order
Make the production scope explicit.
- Technical agreementElectrical duty, construction, interfaces and installation conditions.
- Drawing reviewDimensions, connections, lifting and maintenance clearances.
- Inspection planRequired checks, witness points and documentation deliverables.
- Delivery planningPackaging, transport constraints and site handling requirements.