Oil-immersed · Dry-type

Amorphous Alloy Transformers

An energy-conscious transformer selection begins with the losses over its operating life, alongside load, duty and network requirements.

Engineered for the duty

Consider every hour the transformer is energised.

The YUYUAN product range includes amorphous alloy core designs in oil-immersed and dry-type configurations. Their suitability should be evaluated using the guaranteed no-load and load losses for the proposed rating and the way the transformer will operate.

Send your specification
Transformers from the YUYUAN company brochure; final configuration is model dependent

What to consider

Details that shape the right solution.

  • Core selectionAmorphous alloy core construction is an option when no-load losses are an important selection factor.
  • Whole-life comparisonEvaluate no-load and load losses together with operating hours, load factor and the project cost model.
  • Format flexibilityChoose the insulation and installation format around the site, rather than efficiency considerations alone.

Application planning

Built around how power is used.

01

Continuous distribution

Projects where a transformer remains energised for long periods and loss evaluation matters.

02

Commercial networks

Distributed loads that require a careful comparison of the operating load profile.

03

Energy-conscious upgrades

Replacement studies that compare verified loss data and installation constraints.

Your enquiry

A clearer specification. A better proposal.

Share the details you have. If a requirement is still open, include the project context so it can be reviewed.

  • Required power and voltage ratio
  • Expected annual energised hours
  • Typical and peak load profile
  • Oil-immersed or dry-type preference
  • Required loss limits and evaluation method
Request a quote

Useful answers

Before you specify.

Will an amorphous core always be the best choice?

Selection depends on the rating, loss guarantees, operating profile, installation and project economics. Compare the complete technical proposal rather than the core material alone.

How much energy can my project save?

A meaningful estimate needs the proposed no-load and load losses, operating hours and expected loading. No universal saving percentage applies to every installation.

Are oil-immersed and dry-type versions available?

Both formats appear in the product literature. Ask for the available configuration and model-specific technical documents for your required duty.

Explore further

Related product families.

Talk to YUYUAN

Your project starts with the right questions.

Send the voltage ratio, required capacity and site conditions. Let’s define the transformer around your application.

Request a technical proposal