S9 · S11 · S11-M

Oil-Immersed Transformers

Power and distribution transformers for dependable voltage conversion, with the specification built around your network and installation.

Engineered for the duty

Start with the network. Build around the duty.

The YUYUAN brochure covers oil-immersed distribution and power transformer families, including S9, S11 and sealed S11-M designs. The right selection depends on the incoming supply, load profile, installation environment and the requirements of the receiving utility.

Send your specification
Oil-immersed transformer shown in the YUYUAN product brochure

What to consider

Details that shape the right solution.

  • Network compatibilityDefine the primary and secondary voltage, frequency, vector group and earthing arrangement together.
  • Installation planningReview cooling, connection positions, access, clearances and oil-containment requirements before finalising a layout.
  • Loss evaluationCompare the guaranteed loss values for the proposed model against your operating hours and local requirements.

Application planning

Built around how power is used.

01

Distribution networks

Step-down supply for local distribution and utility-connected projects.

02

Industrial facilities

Plant power distribution where load patterns, starting duties and protection must be coordinated.

03

Project substations

A transformer package coordinated with the switchgear and site layout.

Your enquiry

A clearer specification. A better proposal.

Share the details you have. If a requirement is still open, include the project context so it can be reviewed.

  • Rated power and number of units
  • Primary / secondary voltage and frequency
  • Vector group, taps and impedance requirements
  • Cooling, ambient conditions and installation altitude
  • Termination arrangement and applicable standards
Request a quote

Useful answers

Before you specify.

How do I choose between power and distribution models?

Send the network voltage, required capacity, load profile and installation details. The proposal should match the electrical duty and local network requirements, rather than a model name alone.

Can I request a sealed design?

The brochure includes sealed S11-M designs. State your enclosure, maintenance and environmental requirements so the proposed configuration can be checked.

Which efficiency values apply?

Loss values and efficiency must be confirmed for the quoted rating and design. Request the proposed technical schedule and the relevant test documentation.

Explore further

Related product families.

Talk to YUYUAN

Your project starts with the right questions.

Send the voltage ratio, required capacity and site conditions. Let’s define the transformer around your application.

Request a technical proposal